Daily field logs

269 logs filed by superintendents from 22 Jul 26 to 08 Sep 26

Logs filed
269
across all active projects
Days with delays
85
398 crew-hours lost
Weather delays
53
260 hours — the 11–12 Aug storm and the early-August heat
Progress updates
357
quantities reported into job cost
Peak crew day
35
workers on a single site

Percent complete reported in these logs is the only thing that sets the field percent column on the cost view. When a superintendent reports 62% and the cost report says 71% of the money is spent, the cost to complete is wrong — and that shows up here weeks before it shows up at closeout.

269 of 269 daily logs · 85 with delays recorded
DateLogProjectWeatherCrewDelay hrsWork performedProgress
08 Sep 26TueDL-2451-035RCG-2451Beacon Health Medical Office …Windy · 78°/63°22Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more3

DL-2451-035 · Tue 08 Sep 26

RCG-2451 Beacon Health Medical Office TI · filed by M. Ferraro, superintendent

Weather

Conditions
Windy
High / low
78°F / 63°F
Precipitation
0.0 in.
Wind
13 mph

Crew on site — 22 workers

Granite Demolition ServicesSelective Demolition3
Keystone Concrete ConstructorsCast-in-Place Concrete3
Brightpath FlooringFlooring3
Guardian Fire SystemsFire Suppression3
Copperfield PlumbingPlumbing4
Vantage ElectricElectrical4
RidgelineRidgeline field supervision2

Work performed

  • Weekly foreman coordination meeting held on site; three-week look-ahead updated.
  • Millwork field measurements taken for the reception and nurse station.
  • Branch lines and drops installed at the new ceiling elevations.

Delays

No delays recorded. Full production day.

Deliveries received

None.

Safety

  • Fall protection audit at the leading edge; all crews tied off correctly.

Percent complete reported to job cost

01 General Requirements60%
06 Wood & Plastics18%
21 Fire Suppression61%

These are the figures the cost view uses for field percent complete. Where cost booked runs ahead of the percentage reported here, the cost to complete is understated.

Change order work in progress

Photos (2)

Photo · Progress
General Requirements — work in place, 08 Sept
Photo · Inspection
Wood & Plastics — inspection, 08 Sept
08 Sep 26TueDL-2478-030RCG-2478Kestrel Logistics Warehouse S…Windy · 78°/56°19Layout and control lines verified against the latest field set. +2 more2
08 Sep 26TueDL-2390-004RCG-2390Fairhaven Dental Group TIClear · 81°/64°3Layout and control lines verified against the latest field set. +2 more2
08 Sep 26TueDL-2402-006RCG-2402Willow Court Retail Center Sh…Windy · 78°/56°5Temporary lighting and power extended to the next work area. +3 more4
08 Sep 26TueDL-2495-004RCG-2495Anchor Point Distribution — P…Windy · 78°/56°3Existing pavement broken out and stockpiled for crushing. +3 more1
08 Sep 26TueDL-2487-030RCG-2487Trailhead Coffee Roasters Fit…Windy · 78°/63°5Layout and control lines verified against the latest field set. +3 more3
08 Sep 26TueDL-2465-030RCG-2465Summit Orthopedic Surgery Cen…Clear · 81°/64°9Housekeeping and debris removal; two dumpsters pulled. +2 more3
08 Sep 26TueDL-2470-030RCG-2470Grayson Industrial Park — Bui…Windy · 78°/56°28Temporary lighting and power extended to the next work area. +3 more4
08 Sep 26TueDL-2455-030RCG-2455Marlow Crossing Retail CenterWindy · 78°/63°9Temporary lighting and power extended to the next work area. +3 more4
08 Sep 26TueDL-2482-030RCG-2482Cedar Bluff Urgent CareClear · 81°/64°14Temporary lighting and power extended to the next work area. +2 more3
08 Sep 26TueDL-2447-025RCG-2447Redstone Self-Storage Convers…Windy · 78°/56°6Layout and control lines verified against the latest field set. +3 more4
08 Sep 26TueDL-2492-015RCG-2492Northgate Vision Center TIWindy · 78°/63°6Weekly foreman coordination meeting held on site; three-week look-ahead updated. +1 more2
07 Sep 26MonDL-2451-034RCG-2451Beacon Health Medical Office …Clear · 76°/57°30Existing flooring and adhesive removed; slab scarified. +3 more3
07 Sep 26MonDL-2478-029RCG-2478Kestrel Logistics Warehouse S…Light rain · 77°/58°30Abandoned foundations removed from the pad area. +1 more2
07 Sep 26MonDL-2487-029RCG-2487Trailhead Coffee Roasters Fit…Clear · 76°/57°65Trench patched and slab repoured at the new under-slab plumbing. +2 more3
07 Sep 26MonDL-2465-029RCG-2465Summit Orthopedic Surgery Cen…Overcast · 76°/61°15Selective demolition of existing partitions and ceiling grid. +2 more3
07 Sep 26MonDL-2470-029RCG-2470Grayson Industrial Park — Bui…Light rain · 77°/58°30Existing pavement broken out and stockpiled for crushing. +3 more4
07 Sep 26MonDL-2455-029RCG-2455Marlow Crossing Retail CenterClear · 76°/57°10Existing flooring and adhesive removed; slab scarified. +3 more4
07 Sep 26MonDL-2482-029RCG-2482Cedar Bluff Urgent CareOvercast · 76°/61°92Existing mechanical and electrical devices removed and capped. +3 more3
07 Sep 26MonDL-2447-024RCG-2447Redstone Self-Storage Convers…Light rain · 77°/58°6Existing flooring and adhesive removed; slab scarified. +3 more4
07 Sep 26MonDL-2492-014RCG-2492Northgate Vision Center TIClear · 76°/57°7Existing flooring and adhesive removed; slab scarified. +1 more1
04 Sep 26FriDL-2451-033RCG-2451Beacon Health Medical Office …Windy · 81°/63°21Housekeeping pads formed and poured for the imaging equipment. +2 more3
04 Sep 26FriDL-2478-028RCG-2478Kestrel Logistics Warehouse S…Clear · 83°/68°28Foundation walls stripped and waterproofing applied. +3 more2
04 Sep 26FriDL-2487-028RCG-2487Trailhead Coffee Roasters Fit…Windy · 81°/63°5Solid surface tops templated for fabrication. +2 more2
04 Sep 26FriDL-2465-028RCG-2465Summit Orthopedic Surgery Cen…Light rain · 79°/58°156Housekeeping pads formed and poured for the imaging equipment. +3 more3
04 Sep 26FriDL-2470-028RCG-2470Grayson Industrial Park — Bui…Clear · 83°/68°21Concrete placed and finished; cylinders taken by testing agency. +3 more3
04 Sep 26FriDL-2455-028RCG-2455Marlow Crossing Retail CenterWindy · 81°/63°10Foundation walls stripped and waterproofing applied. +3 more4
04 Sep 26FriDL-2482-028RCG-2482Cedar Bluff Urgent CareLight rain · 79°/58°12Housekeeping pads formed and poured for the imaging equipment. +2 more3
04 Sep 26FriDL-2447-023RCG-2447Redstone Self-Storage Convers…Clear · 83°/68°5Formed and poured column footings; six of nine complete. +3 more4
04 Sep 26FriDL-2492-013RCG-2492Northgate Vision Center TIWindy · 81°/63°5Slab infill placed at the abandoned chase; cured and ground flush. +2 more1
03 Sep 26ThuDL-2451-032RCG-2451Beacon Health Medical Office …Light rain · 79°/58°226Ceiling support steel set above the imaging room. +3 more3
03 Sep 26ThuDL-2478-027RCG-2478Kestrel Logistics Warehouse S…Windy · 81°/61°21Steel erection continued at grid lines 4 through 7. +3 more2
03 Sep 26ThuDL-2390-003RCG-2390Fairhaven Dental Group TILight rain · 75°/53°1Layout and control lines verified against the latest field set. +3 more4
03 Sep 26ThuDL-2402-005RCG-2402Willow Court Retail Center Sh…Windy · 81°/61°5Existing flooring and adhesive removed; slab scarified. +5 more6
03 Sep 26ThuDL-2495-003RCG-2495Anchor Point Distribution — P…Windy · 81°/61°35Existing site improvements demolished and hauled off. +2 more2
03 Sep 26ThuDL-2487-027RCG-2487Trailhead Coffee Roasters Fit…Light rain · 79°/58°54TPO membrane welded and seam-probed; edge metal set. +2 more2
03 Sep 26ThuDL-2465-027RCG-2465Summit Orthopedic Surgery Cen…Light rain · 75°/53°14Ceiling support steel set above the imaging room. +2 more3
03 Sep 26ThuDL-2470-027RCG-2470Grayson Industrial Park — Bui…Windy · 81°/61°29Veneer installed at the east elevation; scaffold advanced. +3 more3
03 Sep 26ThuDL-2455-027RCG-2455Marlow Crossing Retail CenterLight rain · 79°/58°12CMU laid at the screen wall enclosure, four courses. +2 more3
03 Sep 26ThuDL-2482-027RCG-2482Cedar Bluff Urgent CareLight rain · 75°/53°13Lintels and support angles installed at the new openings. +2 more3
03 Sep 26ThuDL-2447-022RCG-2447Redstone Self-Storage Convers…Windy · 81°/61°5Veneer installed at the east elevation; scaffold advanced. +2 more3
03 Sep 26ThuDL-2492-012RCG-2492Northgate Vision Center TILight rain · 79°/58°5Housekeeping and debris removal; two dumpsters pulled. +3 more2
02 Sep 26WedDL-2451-031RCG-2451Beacon Health Medical Office …Rain · 74°/57° · 0.6"294Paint — prime and first finish coat in the exam suite. +1 more
02 Sep 26WedDL-2478-026RCG-2478Kestrel Logistics Warehouse S…Rain · 74°/57° · 0.6"164Building pad compacted and tested; results passing. +2 more
02 Sep 26WedDL-2487-026RCG-2487Trailhead Coffee Roasters Fit…Rain · 74°/57° · 0.6"54Domestic water mains run overhead; insulation to follow. +3 more
02 Sep 26WedDL-2465-026RCG-2465Summit Orthopedic Surgery Cen…Rain · 77°/62° · 0.6"164Sprinkler mains hung and braced above the corridor. +1 more
02 Sep 26WedDL-2470-026RCG-2470Grayson Industrial Park — Bui…Rain · 74°/57° · 0.6"294Waste and vent rough-in at the restroom group. +3 more
02 Sep 26WedDL-2455-026RCG-2455Marlow Crossing Retail CenterRain · 74°/57° · 0.6"104Temporary lighting and power extended to the next work area. +1 more
02 Sep 26WedDL-2482-026RCG-2482Cedar Bluff Urgent CareRain · 77°/62° · 0.6"114Floor levelling compound placed ahead of the lobby flooring. +1 more
02 Sep 26WedDL-2447-021RCG-2447Redstone Self-Storage Convers…Rain · 74°/57° · 0.6"54Miscellaneous metals — stair stringers and pan treads set. +3 more
02 Sep 26WedDL-2492-011RCG-2492Northgate Vision Center TIRain · 74°/57° · 0.6"64Abandoned conduit and piping cut out and hauled off. +2 more1
01 Sep 26TueDL-2451-030RCG-2451Beacon Health Medical Office …Partly cloudy · 79°/61°30Underslab plumbing inspected and backfilled. +2 more
01 Sep 26TueDL-2478-025RCG-2478Kestrel Logistics Warehouse S…Overcast · 81°/65°26Panel schedules updated and circuits labelled. +2 more
01 Sep 26TueDL-2390-002RCG-2390Fairhaven Dental Group TIPartly cloudy · 78°/57°3Slab infill placed at the abandoned chase; cured and ground flush. +2 more3
01 Sep 26TueDL-2402-004RCG-2402Willow Court Retail Center Sh…Overcast · 81°/65°55Layout and control lines verified against the latest field set. +7 more8
01 Sep 26TueDL-2495-002RCG-2495Anchor Point Distribution — P…Overcast · 81°/65°5Building pad compacted and tested; results passing. +2 more1
01 Sep 26TueDL-2487-025RCG-2487Trailhead Coffee Roasters Fit…Partly cloudy · 79°/61°5Panel schedules updated and circuits labelled. +2 more
01 Sep 26TueDL-2465-025RCG-2465Summit Orthopedic Surgery Cen…Partly cloudy · 78°/57°162Drywall hung and taped, first coat on the corridor walls. +1 more
01 Sep 26TueDL-2470-025RCG-2470Grayson Industrial Park — Bui…Overcast · 81°/65°28Mass grading continued at the north half of the pad. +1 more
01 Sep 26TueDL-2455-025RCG-2455Marlow Crossing Retail CenterPartly cloudy · 79°/61°11Panel schedules updated and circuits labelled. +1 more
01 Sep 26TueDL-2482-025RCG-2482Cedar Bluff Urgent CarePartly cloudy · 78°/57°123Ceiling grid installed; tile held pending above-ceiling inspection. +1 more
01 Sep 26TueDL-2447-020RCG-2447Redstone Self-Storage Convers…Overcast · 81°/65°5Waste and vent rough-in at the restroom group. +3 more
01 Sep 26TueDL-2492-010RCG-2492Northgate Vision Center TIPartly cloudy · 79°/61°6Temporary lighting and power extended to the next work area. +2 more
31 Aug 26MonDL-2451-029RCG-2451Beacon Health Medical Office …Windy · 75°/54°28Branch conduit and boxes roughed in at the exam rooms. +2 more
31 Aug 26MonDL-2478-024RCG-2478Kestrel Logistics Warehouse S…Light rain · 81°/64°29Existing site improvements demolished and hauled off. +3 more
31 Aug 26MonDL-2487-024RCG-2487Trailhead Coffee Roasters Fit…Windy · 75°/54°5Sealed concrete floor ground and first coat applied. +1 more
31 Aug 26MonDL-2465-024RCG-2465Summit Orthopedic Surgery Cen…Clear · 79°/64°15Branch conduit and boxes roughed in at the exam rooms. +2 more
31 Aug 26MonDL-2470-024RCG-2470Grayson Industrial Park — Bui…Light rain · 81°/64°20Abandoned foundations removed from the pad area. +3 more
31 Aug 26MonDL-2455-024RCG-2455Marlow Crossing Retail CenterWindy · 75°/54°10Field welding at moment connections; special inspector on site. +2 more
31 Aug 26MonDL-2482-024RCG-2482Cedar Bluff Urgent CareClear · 79°/64°12Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more
31 Aug 26MonDL-2447-019RCG-2447Redstone Self-Storage Convers…Light rain · 81°/64°6Steel erection continued at grid lines 4 through 7. +1 more2
31 Aug 26MonDL-2492-009RCG-2492Northgate Vision Center TIWindy · 75°/54°5Housekeeping pads formed and poured for the imaging equipment. +3 more1
28 Aug 26FriDL-2451-028RCG-2451Beacon Health Medical Office …Light rain · 82°/67°17Paint — prime and first finish coat in the exam suite. +2 more
28 Aug 26FriDL-2478-023RCG-2478Kestrel Logistics Warehouse S…Clear · 86°/71°21Waste and vent rough-in at the restroom group. +1 more
28 Aug 26FriDL-2487-023RCG-2487Trailhead Coffee Roasters Fit…Light rain · 82°/67°54Fixtures set and trimmed in the restrooms. +3 more
28 Aug 26FriDL-2465-023RCG-2465Summit Orthopedic Surgery Cen…Partly cloudy · 77°/63°13Solid surface tops templated for fabrication. +2 more1
28 Aug 26FriDL-2470-023RCG-2470Grayson Industrial Park — Bui…Clear · 86°/71°28Temporary lighting and power extended to the next work area. +3 more2
28 Aug 26FriDL-2455-023RCG-2455Marlow Crossing Retail CenterLight rain · 82°/67°10Sidewalk poured and broom finished at the entry. +1 more
28 Aug 26FriDL-2482-023RCG-2482Cedar Bluff Urgent CarePartly cloudy · 77°/63°13Temporary lighting and power extended to the next work area. +3 more2
28 Aug 26FriDL-2447-018RCG-2447Redstone Self-Storage Convers…Clear · 86°/71°5Subgrade proof-rolled with the geotechnical engineer present. +2 more1
28 Aug 26FriDL-2492-008RCG-2492Northgate Vision Center TILight rain · 82°/67°5Temporary lighting and power extended to the next work area. +3 more4
27 Aug 26ThuDL-2451-027RCG-2451Beacon Health Medical Office …Thunderstorms · 81°/65° · 1.1"278Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more1
27 Aug 26ThuDL-2478-022RCG-2478Kestrel Logistics Warehouse S…Thunderstorms · 74°/54° · 1.1"278Existing site improvements demolished and hauled off. +1 more1
27 Aug 26ThuDL-2390-001RCG-2390Fairhaven Dental Group TIThunderstorms · 78°/59° · 1.1"18Solid surface tops templated for fabrication. +2 more2
27 Aug 26ThuDL-2402-003RCG-2402Willow Court Retail Center Sh…Thunderstorms · 74°/54° · 1.1"58Temporary lighting and power extended to the next work area. +10 more11
27 Aug 26ThuDL-2495-001RCG-2495Anchor Point Distribution — P…Thunderstorms · 74°/54° · 1.1"38Subgrade proof-rolled with the geotechnical engineer present.
27 Aug 26ThuDL-2487-022RCG-2487Trailhead Coffee Roasters Fit…Thunderstorms · 81°/65° · 1.1"58Storefront frames set and shimmed at the main entry. +2 more
27 Aug 26ThuDL-2465-022RCG-2465Summit Orthopedic Surgery Cen…Thunderstorms · 78°/59° · 1.1"1610Selective demolition of existing partitions and ceiling grid. +1 more1
27 Aug 26ThuDL-2470-022RCG-2470Grayson Industrial Park — Bui…Thunderstorms · 74°/54° · 1.1"248Waste and vent rough-in at the restroom group. +2 more1
27 Aug 26ThuDL-2455-022RCG-2455Marlow Crossing Retail CenterThunderstorms · 81°/65° · 1.1"118Subgrade proof-rolled with the geotechnical engineer present. +1 more1
27 Aug 26ThuDL-2482-022RCG-2482Cedar Bluff Urgent CareThunderstorms · 78°/59° · 1.1"138Existing flooring and adhesive removed; slab scarified. +2 more1
27 Aug 26ThuDL-2447-017RCG-2447Redstone Self-Storage Convers…Thunderstorms · 74°/54° · 1.1"58Aggregate base placed and compacted in the parking field. +2 more
27 Aug 26ThuDL-2492-007RCG-2492Northgate Vision Center TIThunderstorms · 81°/65° · 1.1"58Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more
26 Aug 26WedDL-2451-026RCG-2451Beacon Health Medical Office …Overcast · 78°/61° · 0.1"28Firestopping at rated wall penetrations; photos logged for the inspector. +3 more1
26 Aug 26WedDL-2478-021RCG-2478Kestrel Logistics Warehouse S…Overcast · 85°/68°27Fixture whips and lighting rough-in at the corridor. +3 more1
26 Aug 26WedDL-2487-021RCG-2487Trailhead Coffee Roasters Fit…Overcast · 78°/61° · 0.1"5Millwork field measurements taken at the reception casework. +3 more2
26 Aug 26WedDL-2465-021RCG-2465Summit Orthopedic Surgery Cen…Partly cloudy · 86°/67°10Storefront frames set and shimmed at the main entry. +3 more2
26 Aug 26WedDL-2470-021RCG-2470Grayson Industrial Park — Bui…Overcast · 85°/68°195Grouted cells and set cast stone sills. +1 more
26 Aug 26WedDL-2455-021RCG-2455Marlow Crossing Retail CenterOvercast · 78°/61° · 0.1"10Foundation walls stripped and waterproofing applied. +3 more3
26 Aug 26WedDL-2482-021RCG-2482Cedar Bluff Urgent CarePartly cloudy · 86°/67°9Ceiling support steel set above the imaging room. +3 more2
26 Aug 26WedDL-2447-016RCG-2447Redstone Self-Storage Convers…Overcast · 85°/68°5Casework set and scribed at the break room and workroom. +3 more4
26 Aug 26WedDL-2492-006RCG-2492Northgate Vision Center TIOvercast · 78°/61° · 0.1"5Nurse call and low-voltage rough-in at the corridor. +1 more
25 Aug 26TueDL-2451-025RCG-2451Beacon Health Medical Office …Partly cloudy · 81°/66°31Housekeeping pads formed and poured for the imaging equipment. +2 more2
25 Aug 26TueDL-2478-020RCG-2478Kestrel Logistics Warehouse S…Partly cloudy · 87°/66°25Fixtures set and trimmed in the restrooms. +3 more2
25 Aug 26TueDL-2402-002RCG-2402Willow Court Retail Center Sh…Partly cloudy · 87°/66°5Existing mechanical and electrical devices removed and capped. +6 more7
25 Aug 26TueDL-2487-020RCG-2487Trailhead Coffee Roasters Fit…Partly cloudy · 81°/66°5Equipment housekeeping pad poured at the roaster. +3 more4
25 Aug 26TueDL-2465-020RCG-2465Summit Orthopedic Surgery Cen…Windy · 82°/65°13Glazing installed at the south elevation; one lite short, reorder placed. +3 more
25 Aug 26TueDL-2470-020RCG-2470Grayson Industrial Park — Bui…Partly cloudy · 87°/66°21Abandoned foundations removed from the pad area. +4 more5
25 Aug 26TueDL-2455-020RCG-2455Marlow Crossing Retail CenterPartly cloudy · 81°/66°11Temporary lighting and power extended to the next work area. +2 more3
25 Aug 26TueDL-2482-020RCG-2482Cedar Bluff Urgent CareWindy · 82°/65°12Casework set and scribed at the exam rooms and workroom. +2 more3
25 Aug 26TueDL-2447-015RCG-2447Redstone Self-Storage Convers…Partly cloudy · 87°/66°5CMU laid at the screen wall enclosure, four courses. +2 more2
25 Aug 26TueDL-2492-005RCG-2492Northgate Vision Center TIPartly cloudy · 81°/66°52Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more3
24 Aug 26MonDL-2451-024RCG-2451Beacon Health Medical Office …Overcast · 85°/65°18System charged for a partial hydrostatic test; no leaks noted. +3 more2
24 Aug 26MonDL-2478-019RCG-2478Kestrel Logistics Warehouse S…Clear · 79°/61°274Existing pavement broken out and stockpiled for crushing. +2 more
24 Aug 26MonDL-2487-019RCG-2487Trailhead Coffee Roasters Fit…Overcast · 85°/65°5Sprinkler mains hung and braced above the corridor. +2 more
24 Aug 26MonDL-2465-019RCG-2465Summit Orthopedic Surgery Cen…Clear · 86°/67°12Controls contractor pulled thermostat wiring to the new zones. +1 more1
24 Aug 26MonDL-2470-019RCG-2470Grayson Industrial Park — Bui…Clear · 79°/61°256Slab-on-grade prep — vapour barrier, mesh and dowel installation. +2 more3
24 Aug 26MonDL-2455-019RCG-2455Marlow Crossing Retail CenterOvercast · 85°/65°95Drywall hung and taped, first coat on the corridor walls. +3 more
24 Aug 26MonDL-2482-019RCG-2482Cedar Bluff Urgent CareClear · 86°/67°12Storefront frames set and shimmed at the main entry. +3 more1
24 Aug 26MonDL-2447-014RCG-2447Redstone Self-Storage Convers…Clear · 79°/61°6Storm line installed from structure 4 to structure 7. +1 more
24 Aug 26MonDL-2492-004RCG-2492Northgate Vision Center TIOvercast · 85°/65°6Abandoned conduit and piping cut out and hauled off. +2 more1
21 Aug 26FriDL-2451-023RCG-2451Beacon Health Medical Office …Partly cloudy · 81°/66°23Existing flooring and adhesive removed; slab scarified. +1 more2
21 Aug 26FriDL-2478-018RCG-2478Kestrel Logistics Warehouse S…Windy · 87°/68°25Field welding at moment connections; special inspector on site. +1 more1
21 Aug 26FriDL-2487-018RCG-2487Trailhead Coffee Roasters Fit…Partly cloudy · 81°/66°54Roof insulation and cover board installed over two bays. +2 more1
21 Aug 26FriDL-2465-018RCG-2465Summit Orthopedic Surgery Cen…Partly cloudy · 81°/65°156Lintels and support angles installed at the new openings. +2 more1
21 Aug 26FriDL-2470-018RCG-2470Grayson Industrial Park — Bui…Windy · 87°/68°21Feeders pulled to the new sub-panels. +2 more1
21 Aug 26FriDL-2455-018RCG-2455Marlow Crossing Retail CenterPartly cloudy · 81°/66°10Rooftop unit curbs set and flashed by the roofer. +1 more1
21 Aug 26FriDL-2482-018RCG-2482Cedar Bluff Urgent CarePartly cloudy · 81°/65°114Fire alarm devices mounted; wiring pulled to the panel. +1 more1
21 Aug 26FriDL-2447-013RCG-2447Redstone Self-Storage Convers…Windy · 87°/68°6Weekly foreman coordination meeting held on site; three-week look-ahead updated. +5 more6
21 Aug 26FriDL-2492-003RCG-2492Northgate Vision Center TIPartly cloudy · 81°/66°6Branch conduit and boxes roughed in at the exam rooms. +2 more
20 Aug 26ThuDL-2451-022RCG-2451Beacon Health Medical Office …Clear · 88°/73° · 0.0"24Sheet metal crew reworked duct routing around the existing structure. +1 more1
20 Aug 26ThuDL-2478-017RCG-2478Kestrel Logistics Warehouse S…Partly cloudy · 82°/61°16Sheet metal crew reworked duct routing around the existing structure. +3 more
20 Aug 26ThuDL-2402-001RCG-2402Willow Court Retail Center Sh…Partly cloudy · 82°/61°3Solid surface tops templated for fabrication. +1 more
20 Aug 26ThuDL-2487-017RCG-2487Trailhead Coffee Roasters Fit…Clear · 88°/73° · 0.0"5Underslab plumbing inspected and backfilled. +1 more
20 Aug 26ThuDL-2465-017RCG-2465Summit Orthopedic Surgery Cen…Light rain · 82°/63°12Housekeeping and debris removal; two dumpsters pulled. +2 more
20 Aug 26ThuDL-2470-017RCG-2470Grayson Industrial Park — Bui…Partly cloudy · 82°/61°24Controls contractor pulled thermostat wiring to the new zones. +1 more
20 Aug 26ThuDL-2455-017RCG-2455Marlow Crossing Retail CenterClear · 88°/73° · 0.0"9Wall insulation and vapour barrier installed at the perimeter. +2 more
20 Aug 26ThuDL-2482-017RCG-2482Cedar Bluff Urgent CareLight rain · 82°/63°133Glazing installed at the south elevation; one lite short, reorder placed. +1 more
20 Aug 26ThuDL-2447-012RCG-2447Redstone Self-Storage Convers…Partly cloudy · 82°/61°6Foundation walls stripped and waterproofing applied. +3 more3
20 Aug 26ThuDL-2492-002RCG-2492Northgate Vision Center TIClear · 88°/73° · 0.0"4Floor levelling compound placed ahead of the lobby flooring. +3 more
19 Aug 26WedDL-2451-021RCG-2451Beacon Health Medical Office …Overcast · 87°/69°29Roof penetrations flashed for the new curbs and vents. +2 more
19 Aug 26WedDL-2478-016RCG-2478Kestrel Logistics Warehouse S…Clear · 85°/66°30Housekeeping and debris removal; two dumpsters pulled. +2 more1
19 Aug 26WedDL-2487-016RCG-2487Trailhead Coffee Roasters Fit…Overcast · 87°/69°5Layout and control lines verified against the latest field set. +1 more1
19 Aug 26WedDL-2465-016RCG-2465Summit Orthopedic Surgery Cen…Clear · 79°/60°14Weekly foreman coordination meeting held on site; three-week look-ahead updated. +3 more3
19 Aug 26WedDL-2470-016RCG-2470Grayson Industrial Park — Bui…Clear · 85°/66°17Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more2
19 Aug 26WedDL-2455-016RCG-2455Marlow Crossing Retail CenterOvercast · 87°/69°105Miscellaneous metals — stair stringers and pan treads set. +2 more2
19 Aug 26WedDL-2482-016RCG-2482Cedar Bluff Urgent CareClear · 79°/60°14Weekly foreman coordination meeting held on site; three-week look-ahead updated. +2 more2
19 Aug 26WedDL-2447-011RCG-2447Redstone Self-Storage Convers…Clear · 85°/66°5Abandoned conduit and piping cut out and hauled off. +2 more
19 Aug 26WedDL-2492-001RCG-2492Northgate Vision Center TIOvercast · 87°/69°6Nurse call and low-voltage rough-in at the corridor. +2 more
18 Aug 26TueDL-2451-020RCG-2451Beacon Health Medical Office …Overcast · 83°/65°27Ceiling grid installed; tile held pending above-ceiling inspection. +2 more
18 Aug 26TueDL-2478-015RCG-2478Kestrel Logistics Warehouse S…Clear · 84°/64°17Existing pavement broken out and stockpiled for crushing. +2 more3
18 Aug 26TueDL-2487-015RCG-2487Trailhead Coffee Roasters Fit…Overcast · 83°/65°66Millwork field measurements taken at the reception casework. +2 more3
18 Aug 26TueDL-2465-015RCG-2465Summit Orthopedic Surgery Cen…Light rain · 88°/74°14Selective demolition of existing partitions and ceiling grid. +4 more5
18 Aug 26TueDL-2470-015RCG-2470Grayson Industrial Park — Bui…Clear · 84°/64°26Fixtures set and trimmed in the restrooms. +1 more1
18 Aug 26TueDL-2455-015RCG-2455Marlow Crossing Retail CenterOvercast · 83°/65°9Existing flooring and adhesive removed; slab scarified. +6 more7
18 Aug 26TueDL-2482-015RCG-2482Cedar Bluff Urgent CareLight rain · 88°/74°11Existing flooring and adhesive removed; slab scarified. +2 more3
18 Aug 26TueDL-2447-010RCG-2447Redstone Self-Storage Convers…Clear · 84°/64°54Curb and gutter formed and poured at the north drive. +1 more
17 Aug 26MonDL-2451-019RCG-2451Beacon Health Medical Office …Windy · 82°/62° · 0.1"16Fire alarm devices mounted; wiring pulled to the panel. +3 more
17 Aug 26MonDL-2478-014RCG-2478Kestrel Logistics Warehouse S…Clear · 87°/65°25Storm line installed from structure 4 to structure 7. +1 more1
17 Aug 26MonDL-2487-014RCG-2487Trailhead Coffee Roasters Fit…Windy · 82°/62° · 0.1"5Domestic water mains run overhead; insulation to follow. +2 more1
17 Aug 26MonDL-2465-014RCG-2465Summit Orthopedic Surgery Cen…Overcast · 82°/64°15Sheet vinyl flooring and integral base in the procedure rooms. +3 more2
17 Aug 26MonDL-2470-014RCG-2470Grayson Industrial Park — Bui…Clear · 87°/65°18Veneer installed at the east elevation; scaffold advanced. +3 more2
17 Aug 26MonDL-2455-014RCG-2455Marlow Crossing Retail CenterWindy · 82°/62° · 0.1"9CMU laid at the screen wall enclosure, four courses. +2 more2
17 Aug 26MonDL-2482-014RCG-2482Cedar Bluff Urgent CareOvercast · 82°/64°13Roof screen framing installed for the new condensing units. +2 more2
17 Aug 26MonDL-2447-009RCG-2447Redstone Self-Storage Convers…Clear · 87°/65°5Solid surface tops templated for fabrication. +3 more2
14 Aug 26FriDL-2451-018RCG-2451Beacon Health Medical Office …Overcast · 84°/64° · 0.2"27Housekeeping and debris removal; two dumpsters pulled. +2 more3
14 Aug 26FriDL-2478-013RCG-2478Kestrel Logistics Warehouse S…Partly cloudy · 84°/66°17Concrete placed and finished; cylinders taken by testing agency. +2 more
14 Aug 26FriDL-2487-013RCG-2487Trailhead Coffee Roasters Fit…Overcast · 84°/64° · 0.2"6Feeders pulled to the new sub-panels. +3 more
14 Aug 26FriDL-2465-013RCG-2465Summit Orthopedic Surgery Cen…Overcast · 85°/68°15Branch conduit and boxes roughed in at the exam rooms. +1 more
14 Aug 26FriDL-2470-013RCG-2470Grayson Industrial Park — Bui…Partly cloudy · 84°/66°27Sprinkler mains hung and braced above the corridor. +2 more
14 Aug 26FriDL-2455-013RCG-2455Marlow Crossing Retail CenterOvercast · 84°/64° · 0.2"10Existing flooring and adhesive removed; slab scarified. +1 more
14 Aug 26FriDL-2482-013RCG-2482Cedar Bluff Urgent CareOvercast · 85°/68°14System charged for a partial hydrostatic test; no leaks noted. +2 more
14 Aug 26FriDL-2447-008RCG-2447Redstone Self-Storage Convers…Partly cloudy · 84°/66°5Veneer installed at the east elevation; scaffold advanced. +3 more4
13 Aug 26ThuDL-2451-017RCG-2451Beacon Health Medical Office …Clear · 85°/66°26Floor levelling compound placed ahead of the lobby flooring. +4 more5
13 Aug 26ThuDL-2478-012RCG-2478Kestrel Logistics Warehouse S…Windy · 90°/70°23Fixture whips and lighting rough-in at the corridor. +3 more
13 Aug 26ThuDL-2487-012RCG-2487Trailhead Coffee Roasters Fit…Clear · 85°/66°6Trench patched and slab repoured at the new under-slab plumbing. +2 more
13 Aug 26ThuDL-2465-012RCG-2465Summit Orthopedic Surgery Cen…Partly cloudy · 82°/64°13Casework set and scribed at the exam rooms and workroom. +2 more
13 Aug 26ThuDL-2470-012RCG-2470Grayson Industrial Park — Bui…Windy · 90°/70°23Foundation walls stripped and waterproofing applied. +3 more
13 Aug 26ThuDL-2455-012RCG-2455Marlow Crossing Retail CenterClear · 85°/66°12Field welding at moment connections; special inspector on site. +1 more
13 Aug 26ThuDL-2482-012RCG-2482Cedar Bluff Urgent CarePartly cloudy · 82°/64°11Paint — prime and first finish coat in the exam suite. +2 more
13 Aug 26ThuDL-2447-007RCG-2447Redstone Self-Storage Convers…Windy · 90°/70°5Miscellaneous metals — stair stringers and pan treads set. +3 more3
12 Aug 26WedDL-2451-016RCG-2451Beacon Health Medical Office …Rain · 77°/62° · 0.9"154Lintels and support angles installed at the new openings. +1 more
12 Aug 26WedDL-2478-011RCG-2478Kestrel Logistics Warehouse S…Rain · 83°/65° · 0.9"314Underslab plumbing inspected and backfilled. +2 more1
12 Aug 26WedDL-2487-011RCG-2487Trailhead Coffee Roasters Fit…Rain · 77°/62° · 0.9"54Storefront frames set and shimmed at the main entry. +3 more2
12 Aug 26WedDL-2465-011RCG-2465Summit Orthopedic Surgery Cen…Rain · 80°/63° · 0.9"114Slab infill placed at the abandoned chase; cured and ground flush. +3 more
12 Aug 26WedDL-2470-011RCG-2470Grayson Industrial Park — Bui…Rain · 83°/65° · 0.9"304Field welding at moment connections; special inspector on site. +3 more2
12 Aug 26WedDL-2455-011RCG-2455Marlow Crossing Retail CenterRain · 77°/62° · 0.9"108Weekly foreman coordination meeting held on site; three-week look-ahead updated. +1 more2
12 Aug 26WedDL-2482-011RCG-2482Cedar Bluff Urgent CareRain · 80°/63° · 0.9"134Solid surface tops templated for fabrication. +1 more1
12 Aug 26WedDL-2447-006RCG-2447Redstone Self-Storage Convers…Rain · 83°/65° · 0.9"54Ductwork installed above the main corridor. +1 more
11 Aug 26TueDL-2451-015RCG-2451Beacon Health Medical Office …Heavy rain · 75°/55° · 1.8"278Roof screen framing installed for the new condensing units. +2 more
11 Aug 26TueDL-2478-010RCG-2478Kestrel Logistics Warehouse S…Heavy rain · 77°/63° · 1.8"208Steel erection continued at grid lines 4 through 7. +3 more2
11 Aug 26TueDL-2487-010RCG-2487Trailhead Coffee Roasters Fit…Heavy rain · 75°/55° · 1.8"511Trench patched and slab repoured at the new under-slab plumbing. +2 more3
11 Aug 26TueDL-2465-010RCG-2465Summit Orthopedic Surgery Cen…Heavy rain · 80°/60° · 1.8"128Lintels and support angles installed at the new openings. +3 more2
11 Aug 26TueDL-2470-010RCG-2470Grayson Industrial Park — Bui…Heavy rain · 77°/63° · 1.8"288Abandoned foundations removed from the pad area. +6 more7
11 Aug 26TueDL-2455-010RCG-2455Marlow Crossing Retail CenterHeavy rain · 75°/55° · 1.8"108Casework set and scribed at the break room and workroom. +3 more2
11 Aug 26TueDL-2482-010RCG-2482Cedar Bluff Urgent CareHeavy rain · 80°/60° · 1.8"128Acoustic insulation installed in the exam room partitions. +3 more4
11 Aug 26TueDL-2447-005RCG-2447Redstone Self-Storage Convers…Heavy rain · 77°/63° · 1.8"78Layout and control lines verified against the latest field set. +3 more
10 Aug 26MonDL-2451-014RCG-2451Beacon Health Medical Office …Partly cloudy · 83°/63°32Ceiling grid installed; tile held pending above-ceiling inspection. +3 more
10 Aug 26MonDL-2478-009RCG-2478Kestrel Logistics Warehouse S…Overcast · 81°/66° · 0.2"22Storm line installed from structure 4 to structure 7. +3 more
10 Aug 26MonDL-2487-009RCG-2487Trailhead Coffee Roasters Fit…Partly cloudy · 83°/63°32Temporary lighting and power extended to the next work area. +1 more
10 Aug 26MonDL-2465-009RCG-2465Summit Orthopedic Surgery Cen…Clear · 82°/62°16Glazing installed at the south elevation; one lite short, reorder placed. +3 more
10 Aug 26MonDL-2470-009RCG-2470Grayson Industrial Park — Bui…Overcast · 81°/66° · 0.2"28Controls contractor pulled thermostat wiring to the new zones. +1 more
10 Aug 26MonDL-2455-009RCG-2455Marlow Crossing Retail CenterPartly cloudy · 83°/63°10Ceiling grid installed; tile held pending above-ceiling inspection. +3 more
10 Aug 26MonDL-2482-009RCG-2482Cedar Bluff Urgent CareClear · 82°/62°12Lintels and support angles installed at the new openings. +3 more
10 Aug 26MonDL-2447-004RCG-2447Redstone Self-Storage Convers…Overcast · 81°/66° · 0.2"6Entry storefront and access vestibule glazing installed. +2 more
07 Aug 26FriDL-2451-013RCG-2451Beacon Health Medical Office …Windy · 84°/69°27Paint — prime and first finish coat in the exam suite. +1 more
07 Aug 26FriDL-2478-008RCG-2478Kestrel Logistics Warehouse S…Overcast · 87°/70°31Existing pavement broken out and stockpiled for crushing. +2 more2
07 Aug 26FriDL-2487-008RCG-2487Trailhead Coffee Roasters Fit…Windy · 84°/69°6Casework set and scribed at the break room and workroom. +1 more2
07 Aug 26FriDL-2465-008RCG-2465Summit Orthopedic Surgery Cen…Clear · 85°/68°152Existing flooring and adhesive removed; slab scarified. +3 more4
07 Aug 26FriDL-2470-008RCG-2470Grayson Industrial Park — Bui…Overcast · 87°/70°29Housekeeping and debris removal; two dumpsters pulled. +2 more3
07 Aug 26FriDL-2455-008RCG-2455Marlow Crossing Retail CenterWindy · 84°/69°12Foundation walls stripped and waterproofing applied. +3 more4
07 Aug 26FriDL-2482-008RCG-2482Cedar Bluff Urgent CareClear · 85°/68°12Temporary lighting and power extended to the next work area. +4 more5
07 Aug 26FriDL-2447-003RCG-2447Redstone Self-Storage Convers…Overcast · 87°/70°6Firestopping at rated penetrations; photos logged for the inspector. +2 more
06 Aug 26ThuDL-2451-012RCG-2451Beacon Health Medical Office …Hot / high UV · 97°/78°152Existing mechanical and electrical devices removed and capped. +3 more4
06 Aug 26ThuDL-2478-007RCG-2478Kestrel Logistics Warehouse S…Hot / high UV · 95°/74°15Housekeeping and debris removal; two dumpsters pulled. +3 more
06 Aug 26ThuDL-2487-007RCG-2487Trailhead Coffee Roasters Fit…Hot / high UV · 97°/78°5Equipment housekeeping pad poured at the roaster. +2 more
06 Aug 26ThuDL-2465-007RCG-2465Summit Orthopedic Surgery Cen…Hot / high UV · 96°/75°162Nurse call and low-voltage rough-in at the corridor. +2 more
06 Aug 26ThuDL-2470-007RCG-2470Grayson Industrial Park — Bui…Hot / high UV · 95°/74°212Layout and control lines verified against the latest field set. +3 more
06 Aug 26ThuDL-2455-007RCG-2455Marlow Crossing Retail CenterHot / high UV · 97°/78°102Millwork field measurements taken at the reception casework. +3 more
06 Aug 26ThuDL-2482-007RCG-2482Cedar Bluff Urgent CareHot / high UV · 96°/75°125VAV boxes set and hung; flex and diffuser drops to follow. +1 more
06 Aug 26ThuDL-2447-002RCG-2447Redstone Self-Storage Convers…Hot / high UV · 95°/74°62Waste and vent rough-in at the restroom group. +2 more
05 Aug 26WedDL-2451-011RCG-2451Beacon Health Medical Office …Hot / high UV · 100°/86°24Fire alarm devices mounted; wiring pulled to the panel. +3 more
05 Aug 26WedDL-2478-006RCG-2478Kestrel Logistics Warehouse S…Hot / high UV · 97°/78°24Mass grading continued at the north half of the pad. +3 more
05 Aug 26WedDL-2487-006RCG-2487Trailhead Coffee Roasters Fit…Hot / high UV · 100°/86°5Hood installed and hung; balance scheduled after the shaft is closed. +1 more
05 Aug 26WedDL-2465-006RCG-2465Summit Orthopedic Surgery Cen…Hot / high UV · 97°/81°162Fire alarm devices mounted; wiring pulled to the panel. +2 more
05 Aug 26WedDL-2470-006RCG-2470Grayson Industrial Park — Bui…Hot / high UV · 97°/78°182Waste and vent rough-in at the restroom group. +1 more
05 Aug 26WedDL-2455-006RCG-2455Marlow Crossing Retail CenterHot / high UV · 100°/86°102Curb and gutter formed and poured at the north drive. +2 more
05 Aug 26WedDL-2482-006RCG-2482Cedar Bluff Urgent CareHot / high UV · 97°/81°13Slab infill placed at the abandoned chase; cured and ground flush. +1 more
05 Aug 26WedDL-2447-001RCG-2447Redstone Self-Storage Convers…Hot / high UV · 97°/78°5Abandoned conduit and piping cut out and hauled off. +3 more
04 Aug 26TueDL-2451-010RCG-2451Beacon Health Medical Office …Hot / high UV · 100°/85°242Housekeeping and debris removal; two dumpsters pulled. +3 more1
04 Aug 26TueDL-2478-005RCG-2478Kestrel Logistics Warehouse S…Hot / high UV · 102°/84°226Slab-on-grade prep — vapour barrier, mesh and dowel installation. +1 more
04 Aug 26TueDL-2487-005RCG-2487Trailhead Coffee Roasters Fit…Hot / high UV · 100°/85°5Grease exhaust duct welded and pressure tested through the shaft. +2 more
04 Aug 26TueDL-2465-005RCG-2465Summit Orthopedic Surgery Cen…Hot / high UV · 105°/84°112Underslab plumbing inspected and backfilled. +2 more
04 Aug 26TueDL-2470-005RCG-2470Grayson Industrial Park — Bui…Hot / high UV · 102°/84°182Mass grading continued at the north half of the pad. +2 more
04 Aug 26TueDL-2455-005RCG-2455Marlow Crossing Retail CenterHot / high UV · 100°/85°104Housekeeping and debris removal; two dumpsters pulled. +2 more
04 Aug 26TueDL-2482-005RCG-2482Cedar Bluff Urgent CareHot / high UV · 105°/84°132Ceiling grid installed; tile held pending above-ceiling inspection. +1 more
03 Aug 26MonDL-2451-009RCG-2451Beacon Health Medical Office …Hot / high UV · 103°/86°172Slab infill placed at the abandoned chase; cured and ground flush. +3 more4
03 Aug 26MonDL-2478-004RCG-2478Kestrel Logistics Warehouse S…Hot / high UV · 96°/75°183Sheet metal crew reworked duct routing around the existing structure. +1 more
03 Aug 26MonDL-2487-004RCG-2487Trailhead Coffee Roasters Fit…Hot / high UV · 103°/86°5Equipment housekeeping pad poured at the roaster. +1 more
03 Aug 26MonDL-2465-004RCG-2465Summit Orthopedic Surgery Cen…Hot / high UV · 103°/89°142Roof screen framing installed for the new condensing units. +2 more
03 Aug 26MonDL-2470-004RCG-2470Grayson Industrial Park — Bui…Hot / high UV · 96°/75°23Dock equipment set and anchored at three positions. +2 more
03 Aug 26MonDL-2455-004RCG-2455Marlow Crossing Retail CenterHot / high UV · 103°/86°10Rooftop unit curbs set and flashed by the roofer. +1 more
03 Aug 26MonDL-2482-004RCG-2482Cedar Bluff Urgent CareHot / high UV · 103°/89°122Sprinkler mains hung and braced above the corridor. +1 more
31 Jul 26FriDL-2451-008RCG-2451Beacon Health Medical Office …Light rain · 92°/74°22Selective demolition of existing partitions and ceiling grid. +2 more
31 Jul 26FriDL-2478-003RCG-2478Kestrel Logistics Warehouse S…Partly cloudy · 87°/73°20Temporary lighting and power extended to the next work area. +2 more
31 Jul 26FriDL-2487-003RCG-2487Trailhead Coffee Roasters Fit…Light rain · 92°/74°5Storefront frames set and shimmed at the main entry. +2 more
31 Jul 26FriDL-2465-003RCG-2465Summit Orthopedic Surgery Cen…Clear · 87°/69°164Nurse call and low-voltage rough-in at the corridor. +1 more
31 Jul 26FriDL-2470-003RCG-2470Grayson Industrial Park — Bui…Partly cloudy · 87°/73°23Existing pavement broken out and stockpiled for crushing. +1 more
31 Jul 26FriDL-2455-003RCG-2455Marlow Crossing Retail CenterLight rain · 92°/74°12Formed and poured column footings; six of nine complete. +3 more
31 Jul 26FriDL-2482-003RCG-2482Cedar Bluff Urgent CareClear · 87°/69°14Branch lines and drops installed at the new ceiling elevations. +1 more
30 Jul 26ThuDL-2451-007RCG-2451Beacon Health Medical Office …Partly cloudy · 82°/67°31Existing mechanical and electrical devices removed and capped. +3 more
30 Jul 26ThuDL-2478-002RCG-2478Kestrel Logistics Warehouse S…Windy · 83°/68° · 0.2"28Temporary lighting and power extended to the next work area. +3 more
30 Jul 26ThuDL-2487-002RCG-2487Trailhead Coffee Roasters Fit…Partly cloudy · 82°/67°5Rooftop unit curb set and the unit landed by crane. +2 more
30 Jul 26ThuDL-2465-002RCG-2465Summit Orthopedic Surgery Cen…Clear · 86°/68°16Nurse call and low-voltage rough-in at the corridor. +1 more
30 Jul 26ThuDL-2470-002RCG-2470Grayson Industrial Park — Bui…Windy · 83°/68° · 0.2"32Domestic water mains run overhead; insulation to follow. +1 more
30 Jul 26ThuDL-2455-002RCG-2455Marlow Crossing Retail CenterPartly cloudy · 82°/67°14Fire alarm devices mounted; wiring pulled to the panel. +2 more
30 Jul 26ThuDL-2482-002RCG-2482Cedar Bluff Urgent CareClear · 86°/68°12Roof penetrations flashed for the new curbs and vents. +3 more
29 Jul 26WedDL-2451-006RCG-2451Beacon Health Medical Office …Light rain · 87°/70°333Sprinkler mains hung and braced above the corridor.
29 Jul 26WedDL-2478-001RCG-2478Kestrel Logistics Warehouse S…Clear · 84°/65°24VAV boxes set and hung; flex and diffuser drops to follow. +2 more
29 Jul 26WedDL-2487-001RCG-2487Trailhead Coffee Roasters Fit…Light rain · 87°/70°52Hood installed and hung; balance scheduled after the shaft is closed. +3 more
29 Jul 26WedDL-2465-001RCG-2465Summit Orthopedic Surgery Cen…Clear · 83°/69°16Housekeeping pads formed and poured for the imaging equipment. +1 more
29 Jul 26WedDL-2470-001RCG-2470Grayson Industrial Park — Bui…Clear · 84°/65°35Grouted cells and set cast stone sills. +3 more
29 Jul 26WedDL-2455-001RCG-2455Marlow Crossing Retail CenterLight rain · 87°/70°102Ductwork installed above the main corridor. +2 more
29 Jul 26WedDL-2482-001RCG-2482Cedar Bluff Urgent CareClear · 83°/69°11Ductwork installed above the main corridor. +1 more
28 Jul 26TueDL-2451-005RCG-2451Beacon Health Medical Office …Overcast · 88°/69°30Millwork field measurements taken for the reception and nurse station. +3 more
27 Jul 26MonDL-2451-004RCG-2451Beacon Health Medical Office …Partly cloudy · 92°/76°24Selective demolition of existing partitions and ceiling grid. +1 more
24 Jul 26FriDL-2451-003RCG-2451Beacon Health Medical Office …Light rain · 86°/66°31Feeders pulled to the new Level 2 sub-panels. +1 more
23 Jul 26ThuDL-2451-002RCG-2451Beacon Health Medical Office …Partly cloudy · 90°/72° · 0.3"20Rooftop unit curbs set and flashed by the roofer. +3 more
22 Jul 26WedDL-2451-001RCG-2451Beacon Health Medical Office …Overcast · 92°/76°222Existing flooring and adhesive removed; slab scarified. +2 more